‘It’s beginning to look a lot like COMPLETION!’ The KraftMaid kitchen cabinets were delivered and set this week in Reception. Priming, painting and staining are underway still. The sink, cooktop and dishwasher will be connected when the countertops come in. The fridge and microwave are connected. Contractor Gregg Pulsinelli volunteered to set temporary plywood countertops for reception use until then – Thank you Gregg! Our gratitude to willing volunteers like Luis continues as the chapel space is refurbished, the Mountain Ave. windows in the Cave are unblocked and cleaned, and the session room and stairwell gets painted. Electrical punch list items were worked on week. Service on the Media Control Room heater/A-C unit was re-scheduled for 12/10 as parts needed to be ordered. The lawn outside the chapel entrance was dug up to investigate sewer blockages and install a new clean-out. The ‘Jobs for Volunteers’ list is posted outside the sanctuary for those who can lend their time and talents. We appreciate your patience during construction! Your Capital Campaign pledges make this ministry possible - Thank You!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment