THIS WEEK ON THE CONSTRUCTION SITE
The hardwood floor has been installed and is covered for protection. Salvaged bead board and trim was installed in the expanded Porte Cochere foyer after tile was installed. Painting and staining of both foyers and the reception area is to be done next week. The new reception windows are also to be installed next week. Reception kitchen cabinets are to be delivered the first week of December. We are extremely grateful for all the volunteer cleaning and clearing that has been done by Luis. We appreciate your patience during construction. Your Capital Campaign pledges make this ministry possible - Thank You! Faithfully yours - Beth Bowlby, Dave Costain, Lester Erich, Ray Ferreira, Ray Ferreira, Betsy Kamienowski, Louis Kilgore, Linda Owens, Tom Rodgers, Carol Wilson Advocate Al Donato.
WORK DAY! Can you spare a few hours Sunday afternoon?
Join us from 3:00 to 6:00 this Sunday 11/25 to help clear out the POD storage unit, remove the last vestiges of clutter tucked away in the cave, and attack some of the small jobs for Volunteers that remain to be done. Items available: Fiberboard Desk 39.5”W x 19.5”D x 26.75”H with 14”W x 3”D drawer, Wooden Open Shelving Unit 36.5”W x 10”D x 76”H, Double Straight back Choir Pew 14’ long, Curved Choir Pew approx. 15’ long, 5-Drawer File-gray 15”W x 27”D x 52”H, 4-Drawer File-tan 15”W x 12”D x 49”H, Light Oak Alter 66”W x 25.25”D x 40.5”H, Wall Lamp brass with fabric shade, Wall Lamp wood & brass with glass hurricane lens. If you would like any of these items, please come Sunday. Donations will be applied to the cost of the storage unit – Thank you!
Wednesday, November 21, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment